Difference between revisions of "Villagebuild"

From BRC HOA
Jump to: navigation, search
(Who and What)
(Who and What)
Line 23: Line 23:
 
*The rest of the campers arrive Saturday night
 
*The rest of the campers arrive Saturday night
 
*I have purchased a 100' tape measure and now I feel inadequate
 
*I have purchased a 100' tape measure and now I feel inadequate
 +
 +
'''Rejuvenation'''
 +
 +
Damon
 +
*Arriving Saturday night with big stuffs
 +
*Using temporary sleep space arrival night, main setup Sunday
 +
*We have a Bosch GML 40 Laser distance measure...
  
 
'''Spank the Monkey'''
 
'''Spank the Monkey'''

Revision as of 18:33, 11 February 2016

Arrival day will be splendid and challenging! We are all sure to arrive at different times and so we should most definitely have as solid a plan for the village build as possible. This page should eventually form a solid, easy to follow plan but let's get all our thoughts out there.

  • Measuring everything will be nearly impossible
  • Measuring out and placing each camps largest structure (or the hardest thing to relocate) will be more workable
  • Stay calm
  • Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure)
  • Hydrate

Who and What

Bearwhalea

Evan & Co

  • arriving Friday
  • bringing kitchen and sleep space, but not public shade
  • public shade to arrive on Saturday morning

Dr. Carl's

Yeti

  • Arriving Wednesday but not moving to Village space until Saturday
  • The rest of the campers arrive Saturday night
  • I have purchased a 100' tape measure and now I feel inadequate

Rejuvenation

Damon

  • Arriving Saturday night with big stuffs
  • Using temporary sleep space arrival night, main setup Sunday
  • We have a Bosch GML 40 Laser distance measure...

Spank the Monkey

Nugget

-EA Crew arriving Saturday Afternoon

-Bringing everything darling including a 166' tape measure (take that Zac)

-1st night setup generally includes the 30' dome on the corner, the kitchen, and branching out from there.


Trashistan

-most Trashistanis will arrive between early Saturday morning and Saturday evening

building will involve:

-setting up a PVC pentadome, with a 15' center pole, and the "witches hat" fabric draped over and attached to surrounding structures and vehicles

-shower set up

-minimum build crew: Pippin, Alex, Deniz, Hero, Justin