Difference between revisions of "Villagebuild"

From BRC HOA
Jump to: navigation, search
(Who and What)
Line 54: Line 54:
  
 
-minimum build crew: Pippin, Alex, Deniz, Hero, Justin
 
-minimum build crew: Pippin, Alex, Deniz, Hero, Justin
 +
 +
 +
'''ShangriLa'''
 +
 +
- 8 LaLa's (thats what we call ourselves) will arrive on Wednesday
 +
 +
Building will involve:
 +
 +
- setting up 4 shade structures that are 20x36 feet on Thursday & Friday
 +
 +
- One shower  (hopefully by Friday)
 +
 +
- One 10x20 Costco tent for kitchen on Saturday
 +
 +
- Flags, and creating a cozy chill spot by Saturday
 +
 +
We will surround our area with cars.

Revision as of 09:10, 17 February 2017

Arrival day will be splendid and challenging! We are all sure to arrive at different times and so we should most definitely have as solid a plan for the village build as possible. This page should eventually form a solid, easy to follow plan but let's get all our thoughts out there.

  • Measuring everything will be nearly impossible
  • Measuring out and placing each camps largest structure (or the hardest thing to relocate) will be more workable
  • Stay calm
  • Bring a 100' rope marked in 5' increments (or if you're fancy, a 100' tape measure)
  • Hydrate

Who and What

Bearwhalea

Evan & Co

  • arriving Friday
  • bringing kitchen and sleep space, but not public shade
  • public shade to arrive on Saturday morning

Dr. Carl's

Yeti

  • Arriving Wednesday but not moving to Village space until Saturday
  • The rest of the campers arrive Saturday night
  • I have purchased a 100' tape measure and now I feel inadequate

Rejuvenation

Damon

  • Arriving Saturday night with big stuffs
  • Using temporary sleep space arrival night, main setup Sunday
  • We have a Bosch GML 40 Laser distance measure...

Spank the Monkey

Nugget

-EA Crew arriving Saturday Afternoon

-Bringing everything darling including a 166' tape measure (take that Zac)

-1st night setup generally includes the 30' dome on the corner, the kitchen, and branching out from there.


Trashistan

-most Trashistanis will arrive between early Saturday morning and Saturday evening

building will involve:

-setting up a PVC pentadome, with a 15' center pole, and the "witches hat" fabric draped over and attached to surrounding structures and vehicles

-shower set up

-minimum build crew: Pippin, Alex, Deniz, Hero, Justin


ShangriLa

- 8 LaLa's (thats what we call ourselves) will arrive on Wednesday

Building will involve:

- setting up 4 shade structures that are 20x36 feet on Thursday & Friday

- One shower (hopefully by Friday)

- One 10x20 Costco tent for kitchen on Saturday

- Flags, and creating a cozy chill spot by Saturday

We will surround our area with cars.